Article

When Construction Costs Calm Down, Portfolio Risk Gets Harder to See

Avatar photo
Scott Thissen
Oct 26, 2026
Illustration of an AI-powered capital markets platform with a central neural network icon connected to multiple financial workflows, including loan documentation, investor relationships, portfolio analytics, financial performance, banking institutions, and stakeholder management, representing AI-driven automation and connected operations.

A reading of the recent Multifamily Dive piece on construction costs lands differently than it was likely meant to. The story is that costs have moderated. Every developer quoted says some version of “stable is nice, and not enough.” And none of it says anything about a single loan in a single portfolio.

Moderation at the index level and stress at the project level are different measurements, and they are barely correlated in any way a credit officer can use. A borrower in Phoenix with a cost-to-complete problem, or a draw three weeks late because the lien waivers never came in, has no relationship to the national average. The index calms down. The project doesn’t.

Here is the core point worth emphasizing: most banks have no reliable way to tell the difference. The industry reads cost moderation as reduced risk. For a closed loan it’s reduced urgency, which is a different thing, and the reduced urgency is the risk.

Macro Cost Stability Can’t Answer a Loan-Level Risk Question

What the Developers Actually Said

Patrick Kassin, senior vice president and regional development partner at Woodfield Development, told Multifamily Dive that “We haven’t seen costs come down enough to suddenly make a lot of markets work that didn’t work six or 12 months ago.” Tommy Gallagher, Middleburg Communities’ head of construction, described more competitive bids being offset by higher materials and commodities costs. Matt Ritsko, president of construction at Southern Land Co., said fluctuating timelines and prices for labor, rebar, and drywall have caused confusion, and that contractors are building more contingency into their pricing to cover it.

Three developers, one reading: steadier pricing coexists with unresolved project pressure. The article agrees with this piece. It just stops at the project boundary.

Why the Inputs Still Matter

JLL’s 2026 midyear U.S. construction perspective puts a number on the gap under the calm: materials inputs at the goods level running 6.4% higher year over year against final-demand prices up 3.5%, measured through May 2026. Neither is a complete project-cost index. The spread is the point. A bid can be predictable and still carry pressure beneath the final price.

The Credit Distinction

Portfolio risk develops through costs to date, costs to complete, remaining funds, change orders, inspection support, and schedule movement. A national indicator can’t tell you whether a loan is still properly funded, whether contingency is being drawn faster than the schedule justifies, or whether a line item was quietly transferred to cover another. Those are questions about one project’s history, and the only place they get answered is the draw cycle.

The Draw Cycle Is Where Macro and Micro Split

What Each Draw Reveals

Every month borrowers submit draw requests, many still by spreadsheet and email, and someone on the loan administration team reviews them by hand against whatever showed up. Each request lets a reviewer compare reported progress against inspections, supporting documents, prior funding, and the current budget, and the value is in the relationships across that evidence. A change order carries more risk when contingency is falling and inspection support trails reported progress. Several routine draws, compared over time, can show cost-to-complete pressure that no single one shows.

What the data across the draws on because when the environment feels stable, the urgency to question a submission drops, and that ‘s exactly when portfolio risk gets hardest to see.

Where Borrower Reporting Creates Blind Spots

The budget sits in one file, the inspection in another, the change-order support in an inbox. A lender working that way is managing to what borrowers choose to report, whatever the market is doing. A portfolio summary only presents what was captured beneath it, and a credit team has to be able to trace a concern back to the draws that created it. Scattered construction loan documentation is a visibility problem before it’s a staffing problem.

Multifamily Makes the Divergence Visible

Multifamily is the case worth naming because the pipeline from 2021 to 2023 was enormous, and it’s finishing now. RealPage’s first-quarter 2026 data update counts roughly 367,000 apartment completions in the year ending in the first quarter, a fifth consecutive quarter of declining annual supply after deliveries peaked above 589,000 units in late 2024. Effective asking rents were 0.5% below year-earlier levels nationally, with Phoenix recording cuts near 5% while the Midwest and Northeast saw modest increases. RealPage’s supply update puts first-quarter completions at just over 75,205 units, the lightest quarter since early 2022.

Read those from a credit seat. A project that broke ground at peak cost is delivering into a market where the national rent number is flat and the local one may be down 5%. A borrower whose pro forma assumed 2022 rents and 2021 costs is somewhere the macro data can’t see, and a lender running a manual draw process has very limited visibility into how many of those sit in the book. They get what the borrower submits. They review what they have time to review. They flag what they know to look for.

The same gap between index and project runs across residential, commercial, homebuilder, and private credit portfolios. Multifamily just makes the divergence visible because supply, rents, and feasibility vary so much by market.

Manual Review Turns Evidence Into a Timing Problem

Inconsistent Review Reduces Visibility

Review depth varies with staff capacity, experience, documentation quality, and whatever else landed that week. Risk develops across successive draws as contingency declines, documents arrive later, costs move between line items, and reported progress moves ahead of inspection support. Uneven scrutiny makes that pattern hard to see, meaning a team can approve a series of reasonable individual requests without ever seeing the direction of the project’s draw history.

Fast processing has value when review stays accurate. Speed without accuracy just means you’re wrong faster. The draw is also where a stale budget of record finally bites. The total stays flat, contingency absorbs the movement, and it surfaces as a rebid, a change order, or a revised cost to complete.

The Regulatory Consequence Is Operational

The OCC’s Comptroller’s Handbook on Commercial Real Estate Lending sets the expectation, which is timely monitoring, inspection reports that support each disbursement, budget monitoring, and records that show what the bank examined. The FDIC’s commercial real estate lending core analysis has examiners analyze management reporting on lending activity and problem loans. Neither agency prescribes a technology or a monitoring cadence. Both grade the record. A documentation gap becomes a credit administration finding when the examiner reads the file, and disbursements that ran ahead of completed work can draw criticism on the loan itself. How draw issues surface at exam time is covered separately. The point here is that a manual queue is the process least able to show its work.

Earlier Risk Detection Belongs Inside the Draw Cycle

What changes it is visibility living inside the draw cycle itself, meaning: a system that compares reported progress against the project’s own history and surfaces the risk automatically, so the loan officer can act before a draw problem becomes a loan problem. Built spans the full real estate and construction finance lifecycle, from origination through draws, asset management, and portfolio reporting, across residential, commercial, homebuilder, and private credit. Its AI Draw Agent flags 2x more risks than manual review. It’ is also a lot faster, but the risk number is the key focus here. Lender teams state they want to know what they are missing, and faster draws are how they get the bandwidth to find out. How the agent works is covered separately.

What Credit Leaders Can Do This Quarter

Cost indices will keep moderating, probably. The question is whether your portfolio visibility depends on borrower-submitted spreadsheets in a manual queue. Four things a credit officer can do now include the following:

  • Pull the draw history. For every loan underwritten in 2021 or 2022, compare contingency use, change orders, and cost to complete across the last four draws, and read the direction.
  • Re-underwrite the pro forma against the local number. Where market rent is down and the budget of record hasn’t moved, the divergence is already in the book.
  • Set a scrutiny standard. Define what every draw gets compared against, so the review doesn’t depend on which reviewer had time that week.
  • Make the record examinable on demand. If an audit question means rebuilding the file, the process is the finding.

The divergence between macro stability and project-level stress is real. The lenders who build the systems to see it will manage through this cycle. The ones who don’t will find out the same way they always have, which is too late — in the draw.

Book a demo to see what the Draw Agent surfaces across your own portfolio.

Construction Portfolio Risk FAQs

Can Construction Costs Moderate While Project Risk Increases?

Yes. Aggregate pricing can get more predictable while an individual project faces budget pressure, schedule slippage, insufficient remaining funds, or weaker local rents. JLL’s midyear data shows materials inputs rising faster than final-demand prices, and RealPage shows national rents flat while Phoenix fell near 5%. A loan is assessed on its own evidence.

Why Is the Draw Cycle Important for Construction Loan Monitoring?

Each draw connects reported progress with inspections, supporting documents, budget movement, cost to complete, and funds remaining. Reviewed as a series, those relationships are the earliest view a lender gets of emerging project risk. Reviewed one at a time by hand, they are the view least likely to show it.

What Risks Can a Manual Construction Draw Review Miss?

Inconsistent documentation, unsupported budget changes, cost-to-complete pressure, delayed evidence, and patterns across successive draws are all risks manual draw review can miss. The risk usually sits in the relationship between records, which is what a reviewer working one package at a time cannot see.

How Should Lenders Re-Check Construction Loans Underwritten in 2021 or 2022?

Compare the current cost to complete and contingency balance against the original budget, compare the pro forma rent against the current local market, and review the last several draws as a series. A loan whose total hasn’t moved while contingency has been absorbing change is the profile to look at first.

Written by Scott Thissen

Scott Thissen is VP of Enterprise Sales at Built Technologies, where he leads go-to-market strategy and partnerships with top-tier financial institutions modernizing their construction and real estate lending operations.

Scott brings a unique perspective to lending technology: he combines deep sales leadership experience with hands-on expertise in how AI is reshaping customer conversations and deal dynamics. He’s spent the past year reimagining how sales teams can authentically engage with lenders on AI-driven transformation; moving beyond vendor pitches to genuine problem-solving around operational efficiency, risk, and scalability.

His work at Built focuses on helping his teams be consultative real estate experts for their clients navigating our new technology landscape, while building solutions that actually solve real lending problems. He’s passionate about creating frameworks that enable teams to sell smarter and build deeper customer relationships in an AI-driven world.

Scott lives in Brentwood, Tennessee, with his wife and three kids, and spends his free time running to kids soccer games and ballet recitals.

AI Draw Agent

Boost efficiency with an AI agent that handles the heavy lifting so your team can focus on what matters.

Built construction lending webinar registration